ROBOR
www.robor.co.za
|
|
|
Work Performed
|
|
Products Implemented
|
- Productivity Analyser
- Maintenance Monitor
- Profit Maximiser
|
Quote
|
"The implementation of Clockworks has definitely led to an increase in productivity
and has empowered our staff, from the Shop Floor to top management, in making informed
business decisions. The partnership between our various management teams and Consiliarii
has contributed to the overall success achieved in our various Tube Making enterprises."
says Mike Coward, Group MD-Barloworld Robor.
|
|
Barloworld Robor Tube
www.robor.co.za/divisions_robor_tube
|
|
Barloworld Robor Tube is the largest supplier of longitudinally welded steel tube
in Southern Africa. It produces a comprehensive range of Structural Tube and Conveyance
Pipe. Its leading edge manufacturing facility utilizes the latest production and
paint coating technology.
|
Work Performed
|
Detailed Time and Method Studies were performed for Production and Machine Change
Overs. Clockworks Productivity Analyser was implemented in 1997 and the time standards
set are used for performance measurement purposes as well as planning and costing
puposes in the ERP System.
|
Products Implemented
|
|
Quote
|
"Without the Consiliarii system, our production environment would be like a ship
without a rudder" says Johan Grobler, Operations Director.
"The return on the investment is priceless" he adds.
|
|
Barloworld Robor Open Sections
www.robor.co.za/divisions_robor_open_sections
|
|
Barloworld Open Sections was the original manufacturer of cold formed steel sections
in South Africa and has been trading in these products since 1957. This business
is located in Elandsfontein, Gauteng Province and specializes in the production
of a comprehensive range of both standard and special cold formed steel profiles.
|
Work Performed
|
Detailed Time and Method Studies were performed for Production and Machine Change
Overs. Clockworks Productivity Analyser was implemented in 2001 and the time standards
set are used for performance measurement purposes as well as planning and costing
purposes in the ERP System.
|
Products Implemented
|
|
Quote
|
"We use the system for product costing and planning purposes" says Grant Butcher,
Financial Director
|
|
Barloworld Robor Precision Tube
www.robor.co.za/divisions_robor_precision_tube
|
|
Barloworld Robor Precision Tube has been manufacturing longitudinally welded steel
tube from both cold and hot rolled steel since 1964. They service a wide spectrum
of markets including the automotive, furniture, general engineering, shop fitting
display, power generation, building and construction, mining, fencing, refrigeration,
medical, garden tools and equipment and security industries.
|
Work Performed
|
Time Standards for Production and Machine Change Overs were derived from actual
perfomance in the past. Clockworks Productivity Analyser was implemented in2002
at both the tube making and draw benching facilities. The time standards are used
for performance measurement purposes as well as planning and costing purposes in
the ERP System.
|
Products Implemented
|
- Productivity Analyser
- Maintenance Monitor
- Profit Maximiser
|
Quote
|
"Maintenance Monitor allows us to take core maintenance information and apply it
to all the areas of the production line, enabling us to generate planned maintenance
schedules, better stock our parts, spares and tools while still monitoring our costs
more closely" comments, John Hadjidimitriadis, Maintenance Technologist.
"Accurate measurement of the time and expense spent maintaining our production line
has enabled us to drastically improve the management of the process, reducing stoppages
as well as costs. The system assists us to focus on critical Shop Floor issues and
to make more money" says Quinton Klopper, Operations Manager.
|
|